Sludge Feed Rate Calculator

Posted by Dinesh on

Use the simple wastewater calculator to calculate the sludge feed rate for the dewatering facility.

Sludge Feed Rate Calculation

gal/day of digested sludge :
operating (h/day) :
Sludge feed rate for the dewatering facility:

Formula:

Sludge feed rate = (gal/day of digested sludge) / ( (operating h/day) × (7 days/week) × (60 min/h) )